BlocksHaryana
Nodal AgencyHAREDA
DiscomsDHBVN/UHBVN
Eligible consumerAll Eligible Consumers of electricity in the area of supply of the distribution licensee having or proposing to install a roof top solar energy system may opt for grid connectivity subject to the net metering arrangement pursuant to these Regulations.
Mode of ProjectCAPEX/RESCO
Min /Max1KWp/1MP
LoadEquals to 100 % of the sanctioned load
Types of MeteringNet Metering/Gross Metering
Mandatory InstlattionMandatory for new residentialbuildings having plot size more than 500 sq. yards to install 3% to 5% capacity of their Sanctioned Load on solar..Mandatory for all Commercial complexes, Offices, Malls, etc. (existing as well as new buildings) having Connected Load of 50 kW and above to install 3% to 5% capacity of their Connected Load of solar.
Energy Settlement90% of the total consumption may be met out from the solar power under net-metering RegulationsThe carry forward of excess energy generation shall be allowed from one billing cycle to the next billing cycle up to the end of the same financial year. Any excess generation (above 90%) at the end of the financial year shall not be offset against the consumer’s consumption.
Billing MechanismAnnual(1 aPril to 31 March)
Central SubsidyResidential sector (maximum up to 3 kW capacity ):40 % of benchmark cost (above 3 kW capacity and up to 10 kW capacity)*:40 % up to 3 KW Plus 20% for RTS system above 3 kW and up to 10 kW.e.
Financial Incentives for Industrial and commercial.40 % Accelerated Depreciation .
State SubsidyNA
Benchmark cost from State1 kWp to 10 KWp : Rs. 10 kWp to 100 kWp : Rs. 41420/- 100-500Kwp: 36950/-