Nodal Agency | UPNEDA |
Discoms | UPPCL/PuVVNL/PVVNL |
Eligible consumer | Metered Agricultural or metered Residential/Domestic category can install rooftop solar PV system under the net metering arrangement or the Gross Metering Arrangement |
Mode of Project | CAPEX |
Min /Max | 1KWP/2 MWP |
Load | Equals to 100 % of the sanctioned load |
Types of Metering | Net metering/Gross Metering |
Mandatory Instlattion | NA |
(Solar Injection Compensation). | Gross Metering:Any net electricity injected in the grid shall be paid at rates decided by UPERC. Which will be the weighted average tariff calculated by the avearge of bidding tariff of last year + 25 % .incentive |
Energy Settlement | electricity injected exceeds the electricity consumed during the billing period, such excess injected electricity shall be carried forward to next billing period as electricity credit and may be utilized to net electricity injected or consumed in future billing periods but within the settlement period. |
Other Charges | Fixed Charges/Government Levy |
Billing Mechanism | Annual( 1 April to 31st March) |
Central Subsidy | Residential sector (maximum up to 3 kW capacity ):40 % of benchmark cost (above 3 kW capacity and up to 10 kW capacity)*:40 % up to 3 KW Plus 20% for RTS system above 3 kW and up to 10 kW. |
Financial Incentives for Industrial and commercial. | 40 % Accelerated Depreciation |
State Subsidy | Additional 15000/KW capped upto INR 30000/- for residential consumers. |
Benchmark cost from State | 1-10 Kw: 38000/- 10-100Kw: 32000/- |